Skip to content
Gaurav Albal
← All writing

Agents

How much of the job did you still do?

A long agent run can hide a lot of human work. Useful delegation depends on the outcome, the attention it required, and what happened after the agent said it was done.

Gaurav Albal 6 min read

Imagine two ways to give an agent the same migration. Same codebase, same compatibility promise, same deadline. This is a thought experiment.

In the first, you map the dependencies, write the implementation sequence, and explain the old system's exceptions. The agent runs overnight. In the morning, you reconstruct what changed, discover a caller it missed, and guide the repair. Eventually, the migration works.

In the second, the agent investigates the dependencies and proposes a sequence. It brings you a consequential decision about the rollout. You decide. It implements, checks the affected callers, repairs what failed, and returns with evidence you can review. The migration works here too.

The first system might have the more impressive runtime. The second might have taken more of the job off your hands.

“Ran all night” describes the agent's evening. I'd also like to hear about your morning.

Which clock are we reading?

Three things are being bundled together when we call a workflow faster: the time people spend working on it, the elapsed time until the result is usable, and the extent to which it keeps claiming their attention.

They can move in different directions. A migration can finish sooner because you supervise it constantly. Another can take longer while leaving you free to work on something else. A third can use little active human time while requiring unpredictable check-ins that make it difficult to leave alone.

The deadline matters. So does the day you had while meeting it. You cannot infer either from the length of the agent's run.

This gets harder when work happens in parallel. In its February 2026 update, METR identified unreliable task-time measurements for developers using agents concurrently. They could work on something else while an agent ran. Selection effects also complicated that experiment; the update was an explanation of measurement limits, not a new universal productivity estimate.

Adding up the durations of overlapping runs doesn't tell you how much human labor they replaced. Counting the gaps between prompts as free time doesn't establish that the person was able to use them.

Runtime is useful operational data. Commits tell you something about activity. Pass rates tell you something about performance on the checks being run. Each needs the rest of the assignment attached before it becomes evidence of useful delegation.

The work outside the recording

Return to the migration. The first agent started after someone had already resolved much of the ambiguity. It stopped before someone had finished checking and repairing the result.

You can get a remarkable autonomy claim by moving the start and finish lines close enough together. The agent did everything between them. It had considerable help arranging the distance.

For an assignment, the relevant human work starts with making the problem delegable. That includes clarifying requirements, deciding constraints, and supplying context the system cannot obtain. It continues through supervision, reconstruction after a handoff, review, and recovery. If the team had to build and now maintains a custom workflow, that work belongs somewhere in the account too.

This doesn't mean charging every planning meeting to the agent. Much of that work would exist anyway. The question is what changes against a competent alternative: the tools, context, and practices the team would actually use. Compared to what? still applies after you've found a more interesting numerator.

Setup can be a worthwhile investment. Count it separately from recurring effort, then see whether repeated use earns it back. Hiding setup flatters the new tool; treating reusable setup as a fresh cost on every assignment flatters the incumbent.

Likewise, work transferred to a teammate still happened. A developer can save time by handing a much larger review to the engineering lead. The developer's improvement and the team's improvement are different claims.

What if I want to do more work?

This is the best objection to making human effort the headline. The goal may be to attempt a migration you would otherwise defer, explore a better design, or maintain something that was quietly deteriorating. You might happily spend the same amount of time and get a substantially more useful result.

Good. Any measurement that calls that a failure needs fixing.

METR made a related distinction in its May 2026 survey: perceived speed gains and perceived value gains are different questions, especially when AI changes the tasks people choose. Those answers were self-reports from a convenience sample. The useful point here is the distinction, not a multiplier to put on an Arq slide.

The amount of work worth doing can change when implementation becomes cheaper. A prototype you would never have staffed might now be a sensible experiment. Time spent deciding among several plausible approaches may be more valuable than time spent implementing the only approach you could afford.

That means preserving the outcome in the comparison: what became possible, what scope was completed, what quality it reached, and whether it arrived in time to matter. Less human effort on a smaller, less useful assignment is an efficiency improvement with a rather important footnote.

The migration thought experiment holds those things fixed so we can inspect delegation. Real comparisons often won't. Say what changed instead of compressing the difference into a score that pretends it didn't.

Keep the attempts in the picture

A winning run isn't the whole purchase.

If reaching the working migration involved a discarded approach, a restart, or a human repair, those belong to the history of getting it done. Reporting only the attempt that finally passed makes the result look cheaper and more reliable than the process that produced it.

That doesn't make every discarded attempt waste. If the assignment was to choose an approach, learning why one fails may be part of a successful answer. If the assignment was to ship the migration, an abandoned implementation can produce useful knowledge without becoming a shipped migration. We can recognize both without changing the label halfway through.

Follow the change far enough to catch the relevant consequences, too. A clean merge followed by a broken caller is a different result from a working migration. Pick an observation period appropriate to the change and state what it cannot establish. Maintenance costs that have not yet appeared are unknown, not zero.

This is why I wouldn't reduce delegation to “accepted tasks per human hour” and declare measurement finished. That number can improve because the tasks became smaller, the acceptance standard weakened, or inconvenient attempts disappeared. It can also improve because the system got better. You need enough context to distinguish those explanations.

Zero interruptions is a terrible target

The second agent in our example asked for a rollout decision. That interruption could be exactly why the workflow was useful.

A consequential choice may depend on a business commitment the system cannot make. An agent that guesses has fewer questions to report. It may also leave you with a decision you never authorized.

Count the attention that decision required. Then distinguish it from reconstructing lost context, repeating an instruction, or repairing a mistake the system should have caught. Those interventions cost something, but they do not all buy the same thing.

There is also a difference between a review you can schedule and a process that keeps demanding another small answer. I wouldn't assign every interruption a universal penalty in minutes. I would ask whether the workflow let the person put their attention elsewhere, and whether the next question arrived with enough context to answer it.

The purpose of delegation is to let your judgment govern more work. It would be an odd product that improved its autonomy score by preventing you from exercising it.

What the buyer should demand

Give the systems consequential work, with the context and setup each reasonably needs. Keep the scope and acceptance standard visible. Show the result, the human involvement, the elapsed time, and the failures that came before it. A brief record of what the person actually had to do is more informative than a theatrical unattended run.

That record tells you what happened. To claim work saved, you still need a credible comparison with the alternative workflow, accounting for differences in the assignments and the context each system received. Replaying the same migration can give the second workflow the benefit of what the team learned on the first attempt. If those differences remain unresolved, report the work observed and leave the saving unclaimed.

The economics extend beyond a cheaper coding session. A small team with scarce experienced attention may be willing to pay for fewer routine demands on it, even when the model bill increases. Another team may prefer to keep operating its own workflow. The difference has to show up in the work, including the cost of running the product that promises to help.

I'm building Arq around the whole assignment. It's in development, and any claim it earns will need this accounting.

The comparison must keep moving as the alternatives improve. If a better model makes a review step or a handoff unnecessary, remove it. If the bundled agent handles the same assignment with less effort and friction, that is the result. A product shouldn't need its customer's old workflow preserved in amber to look good.

When the work was ready to use, how much of the job had actually left your desk?

Filed underAgents